BREAKDOWN COVER

This can be part of an annual service contract or as a stand alone arrangement. Please contact us for a personal quotation.

TRAINING

As part of our commitment to safe working practices, we will provide training for Boiler House Attendants with specific reference to Health and Safety Guidelines (PM5) for the Blowdown Procedures for steam boilers. We can also advise on compliance with the Health and Safety Guidelines (PM60) referring to Blowdown Systems. Please contact us for further details.

GAS SAFETY

Soundness Testing with Certification


previous
Page 5 of 5
Gas soundness tests must be performed:
  1. whenever a smell of gas is suspected or reported.
  2. whenever work is done on a gas fitting
  3. before restoring the gas supply after work on an installation.
  4. prior to the fitting of a gas meter
  5. on completion of any extension or alteration.
  6. before wrapping, painting, burying or concealing any installation
Do you have the relevant certificate?

If you are unsure contact us on:

0161 790 4411


© Copyright 2004 Hodgkinson Bennis Limited